File #: 2016-0206    Version: 0 Name: LaGrange Road Enhancements - Construction Management/Implementation Funding
Type: MOTION Status: PASSED
File created: 3/16/2016 In control: Board of Trustees
On agenda: 3/21/2016 Final action: 3/21/2016
Title: /Name/Summary LaGrange Road Enhancements - Construction Management/Implementation Funding
Attachments: 1. Exhibit B - Work Limits, 2. V3 Construction - Modification B LaGrange Rd Corridor

Title/Name/Summary

LaGrange Road Enhancements - Construction Management/Implementation Funding

 

History

As part of the Village's FY 2014-15 budgets, $7,000,000 was budgeted and approved to be utilized for construction of the LaGrange Road aesthetic enhancements through an At-Risk Construction Management delivery method. The Village enhancements include brick paver sidewalks, irrigation, stone/brick monuments, stone/brick columns, decorative fencing, various plantings and decorative stone/brick median walls. To date approximately $900,000 has been spent coordinating and implementing the construction of various enhancement items. These items include management and supervision, permit and bonds, material testing, brick paver and colored concrete work at 167th and 171st, electrical conduit placed in the medians south of 159th, irrigation conduit and controller installed south of 159th, water main connection at the Toys R Us property, and the planting of trees along the east parkway of LaGrange south of 159th.

 

Funds for the Village enhancements were budgeted in three fiscal year, 2014 - $3.5M, 2015 - $3.5M and 2016 - $1.88M totaling $8,887,405. In addition V3 was originally contracted to provide construction observation services for the LaGrange Road work. However, since the project was transferred to a construction management project the remaining $711,486.53 is proposed to be added to the current construction management project for a total cost of $9,598,891.53. It is important to have the necessary funds available for implementation of the enhancements as the LaGrange Road widening project progresses. Attached in Legistar is an anticipated scope of work for 2016 and into 2017. V3 will assemble specific trade bid packages which will be publicly bid and opened. The Village will approve the bid packages which will be billed against the not-to-exceed Construction Management Contract. The LaGrange Road corridor project is a high profile local and regional project. The Village has invested significant resources to deliver a project that is above and beyond a typical IDOT project. The ability to coordinate and construct the enhancements within the same time frame as IDOT's project schedule with the quality the Village expects is critical to the success of this project.

 

Financial Impact

Funds for this contract, in the amount of $1,887,405 are included in the Village's FY 2016 budget. The $711,486.53 remaining in PO #13-001385 will be transferred to the current Construction Management Contract with V3 Construction Group.

 

Recommended Action/Motion

I move to approve amending the contract with V3 Companies of Woodridge, Illinois by adding $2,598,891.53 for construction management and implementation of the LaGrange Road Enhancements utilizing the current At-Risk Construction Manager delivery method.