header-left
File #: 2011-0328    Version: Name: Madison Construction Geothermal and Appearance Review
Type: MOTION Status: IN BOARD OF TRUSTEES
File created: 5/24/2011 In control: Board of Trustees
On agenda: 7/5/2011 Final action: 7/5/2011
Title: /Name/Summary Madison Construction - Appearance Review
Attachments: 1. GES SP.pdf, 2. MadCon Appearance Review Approval.pdf
Title/Name/Summary
Madison Construction - Appearance Review

History
PROJECT:
Madison Construction - 2011-0328

PETITIONER:
Luke Wolbrink
Madison Construction

REQUESTED ACTION:
Elevation/ Appearance Review

PURPOSE:
The purpose of this petition is renovate the exterior appearance of the building located at 15657 S. 70th Court on three sides.

LOCATION:
15657 S. 70th Court

P.I.N. NUMBER:
28-18-310-005
28-18-310-012

ATTACHMENTS:
Elevations

SIZE:
83,500 square foot lot

EXISTING ZONING:
MFG Manufacturing District

EXISTING LAND USE:
Industrial

SURROUNDING ZONING AND LAND USE:
North: MFG Manufacturing District - Motor Vehicle Services and other industrial units
South: BIZ General Business District - Meijer/ Enterprise Rent A Car
East: BIZ General Business District - (across 70th Court) Motor Vehicle Services
West: Not in Orland Park - Oak Forest Residential Districts

COMPREHENSIVE PLAN DESIGNATION:
Community Intensity Commercial/ Office

TRANSPORTATION:
This site is accessible from 157th Street, a minor collector street, and 70th Court, both local streets.

PLANNING OVERVIEW:
Madison Construction was approved for a geothermal energy system by the Village Board on July 5, 2011. This project is related in that the proposed improvements are happening at the same time.

DISCUSSION:

Project Description
The petitioner proposes to renovate the exterior appearance of the structure, particularly on the north, west and south elevations. Aside from the geothermal energy system, no changes will occur to the site plan of the site.

West Elevation
On the west elevation, the petitioner proposes to replace all existing windows with similar sized windows in the existing window openings. Six (6) new windows and openings will be created on the second floor of the building. The entire existing mansard overhang/ canopy will be removed in favor of the new windows. In addition to this a new main entrance will be constructed, with increased transparency on the first and second f...

Click here for full text