header-left
File #: 2018-0728    Version: Name: Solar Panel Installation - 8917 Wheeler Dr. - Guzinski Residence
Type: MOTION Status: PASSED
File created: 10/15/2018 In control: Board of Trustees
On agenda: 12/3/2018 Final action: 11/13/2018
Title: /Name/Summary Solar Panel Installation - 8917 Wheeler Drive - Guzinski Residence
Attachments: 1. Plan Set, 2. Structural Report, 3. Site Photos, 4. Owner Authorization, 5. Aerial
Title/Name/Summary
Solar Panel Installation - 8917 Wheeler Drive - Guzinski Residence

History
QUICKFACTS

Project
Solar Panel Installation - 8917 Wheeler Drive - Guzinski Residence
2018-0728 / AR-18-00570

Petitioner
Courtney Scallhorn, Permit Coordinator
TESLA, Inc.

Purpose
The purpose of this petition is to install and maintain an 11.34 kW solar array as part of a mounted solar panel system at a single-family residence located at 8917 Wheeler Drive.

Requested Actions: Appearance Review (Environmental Clean Technology)

Project Attributes
Address: 8917 Wheeler Drive

P.I.N.(s): 27-15-218-009-0

Parcel Size: 0.227 Acres; 10,392 SF
Building Size: 2,152 SF

Comprehensive Plan Planning District: Silver Lake South Planning District
Comprehensive Land Designation: Single Family Residential
Existing Zoning: R-3 Residential District
Existing Land Use: Single Family Home

Subdivision: Village Square of Orland
PD: No

Surrounding Land Use:
North: R-3 Residential District - Single Family Home
South: R-3 Residential District - Single Family Home
East: R-3 Residential District - Single Family Home
West: R-3 Residential District - Single Family Home

Preliminary Engineering: A structural engineering report was submitted with this petition, which concluded that the roof structure can safely support the weight of the proposed solar panels.

PLANNING OVERVIEW AND BACKGROUND
Section 6-314.C of the Land Development Code requires that the petitioner seeking a renewable energy or environmental clean technology system first obtain an Environmental Clean Technology (ECT) review from the Plan Commission. Subsequent to such a review, this project will follow the standard development review process. A review will next take place at the Development Services and Planning Committee and then a final review and decision from the Village Board of Trustees.

PROJECT DESCRIPTION & CONTEXT
The petitioner is proposing to install and maintain 11.34 kW grid interactive solar arrays, co...

Click here for full text