We have received two (2) Change Orders from Matthew Paving, Inc. as per Christopher B. Burke Engineering, Ltd.  The first one is because of a collapsed drainage pipe that needs to be repaired.  The second is to make sure that the path will never be under water during heavy rains.

 

Removal of 80 feet of 8 inch RCP due to collapse.  Haul from site.  80 feet of new 10 inch RCP including trench bedding and backfill.  Total $3650.00.

 

Install an additional 6 foot catch basin.  72 feet of new 12 inch RCP pipe.  Change existing pipe dimension from 6 IN CMP to 12 IN RCP blocks and grates for all flared end sections.  Total Extra $11,355.

 

On December 3, 2007 the Village Board approved $380,687.00 as the original cost of this project.

 

On April 28, 2008, this item was reviewed and approved by the Recreation Committee and referred to the Board for approval.

 

Financial Impact

A budget adjustment is needed for this project in the amount of $15,005.00 to Account No. 023-4004-451-7080.

 

Recommended Action/Motion

I move to approve accepting the Change Order from Matthew Paving, Inc. in an amount not to exceed $15,005.00; 

 

And

 

I move to approve a budget adjustment in an amount not to exceed $15,005.00.