header-left
File #: 2007-0800    Version: Name: Heavenly Massage of Orland Park
Type: MOTION Status: PASSED
File created: 12/11/2007 In control: Board of Trustees
On agenda: Final action: 5/5/2008
Title: Heavenly Massage of Orland Park
Attachments: 1. Heavenly Massage Elevations, 2. Heavenly Massage Layout
Title
Heavenly Massage of Orland Park

History
On February 4, 2008 the Village Board approved the as built elevations titled “Elevations Robbins and Heavenly Massage and Spa 159th and LaGrange Road”, prepared by Arcline Associates Ltd., dated 10-02-06, last revised 1-17-08, project number 2526, sheet A2.1 subject to the following conditions:
1. That the petitioner/owner provide plantings in the planting beds under the new windows and by the main entrance with plants that provide seasonal interest, and tall plants between the windows and next to the main entrance;
2. That the petitioner/owner does not continue the use of yew bushes under the windows;
3. That the petitioner/owner attempt to achieve a cross-across access agreement with the property to the north at Harrison’s Restaurant.

And
The Village Board moved to approve a minor special use to authorize the location of a 7,100 square-foot personal service establishment known as “Heavenly Massage of Orland Park” at 9570 W 159th Street in a BIZ General Business District subject to the same conditions as above.

Post-Approval Follow-Up
Since the Village Board’s approval of the as built elevations and the minor special use, the owner of the building at 9570 W 159th Street has met with the Village of Orland Park and his neighbors at the Harrison’s Restaurant and Brewery at 15845 S La Grange Road. A meeting was held on April 14, 2008 regarding the cross access between Village staff, representatives from Harrison’s and representatives from Terraco Inc., the landlord of the 9570 W 159th Street site.

At the meeting the possibility of achieving cross access parking lots was discussed. Shared lots were not discussed. Staff presented the two parties engineering documents that addressed the physical and economic feasibility of achieving the cross access between Harrisons and the Robbins/Heavenly Massage center. The engineering documents, which were preliminary estimates for work and surveys, were prepared by Christopher ...

Click here for full text