header-left
File #: 2010-0264    Version: 0 Name: Proposal Award Police Station Native Landscape
Type: MOTION Status: PASSED
File created: 6/2/2010 In control: Board of Trustees
On agenda: 6/7/2010 Final action: 6/7/2010
Title: Proposal Award Police Station Native Landscape
Attachments: 1. Native Prairie Meander Survey Results, 2. Pizzo Ecological Restoration Sevices, 3. Pizzo and Associates
Title
Proposal Award Police Station Native Landscape

History
We have continued to work to enhance the Police Station Native Landscape and have concluded that in order to reach the expectations that were presented to the Village during the construction phase, the site needs to be cleared, prepped, reseeded and most importantly, maintained by a qualified ecological restoration firm.

After working through the issue with the Village's contractor, George Sollitt Corporation, it was determined that Pizzo & Associates should be brought in to provide consultation on this project. A survey was completed and their conclusions are stated in the attached letter titled "Orland Police Headquarters - Native Prairie Meander Survey Results." The survey showed that this area was performing inadequately. It states that "The acceptance criteria also specify that at least 75% of the species seeded and/or planted must be apparent and alive. There were 15 different species of native seed installed on the site. Based on the results of the meander survey 7 species (46.67%) that were installed were alive and apparent. Therefore, this performance standard has not been met."

George Sollitt Corp. representatives have offered to contribute a payment of $10,000.00 toward resolving this issue to off-set the cost of the work proposed by Pizzo & Associates, Ltd. In order to effectively plant the area this season, immediate action needs to be taken to approve this work. The Pizzo proposal to restore the area is outlined in the attached proposal. The FY2010 cost to clear and prep the site is as follows:

2010 - Herbaceous Clearing/Site Prep $2,124.00

2010 - Seed Installation $5,175.00

Total $7,299.00

The additional cost for appropriate stewardship to ensure the success of the native plantings is summarized below:

Labor - billed $45.00 per man hour including travel time

General Stewardship - not to exceed $4,320.00 in FY2010

Applied Herbicide - not to exceed $200.00 in FY2010...