header-left
File #: 2018-0680    Version: Name: Solar Panel Installation – 11353 Longwood Circle – Halper Residence, Installation of 10.56 kW Solar Array as part of an Environmental Clean Technology (ECT) Review
Type: MOTION Status: PASSED
File created: 10/3/2018 In control: Board of Trustees
On agenda: 12/3/2018 Final action: 12/3/2018
Title: /Name/Summary Solar Panel Installation - 11353 Longwood Circle - Halper Residence
Attachments: 1. Aerial, 2. Plan Set, 3. Photos - Existing Conditions, 4. Solar Glare Documentation, 5. Specification Sheets
Title/Name/Summary
Solar Panel Installation - 11353 Longwood Circle - Halper Residence

History
QUICKFACTS

Project
Solar Panel Installation - 11353 Longwood Circle - Halper Residence, Installation of 10.56 kW Solar Array as part of an Environmental Clean Technology (ECT) Review
2018-0680 / AR-18-00562

Petitioner
Sunrun Installation Services, Inc.

Purpose
The purpose of this petition is to install and maintain a roof-mounted solar panel system at a single-family residence located at 11353 Longwood Circle.

Requested Actions: Appearance Review (Environmental Clean Technology)

Project Attributes
Address: 11353 Longwood Circle
P.I.N.(s): 27-30-418-010-0000
Parcel Size: 0.14 acres (6,435 square feet)

Comprehensive Plan Planning District: Grasslands Planning District
Comprehensive Land Designation: Single Family Residential
Existing Zoning: R-4 Residential District
Existing Land Use: Single Family Home

Surrounding Land Use:
North: R-4 Residential District - Single-family home
South: R-4 Residential District - Open space for the Crossings at Brook Hills subdivision
East: R-4 Residential District - Single-family home
West: OS Open Lands District - ComEd easement (overhead power lines)

Preliminary Engineering: A structural engineer report was submitted, which concluded that the roof structure can safely support the weight of the proposed solar panels.

PLANNING OVERVIEW AND BACKGROUND
Section 6-314.C of the Land Development Code requires that the petitioner seeking a renewable energy or environmental clean technology system first obtain an Environmental Clean Technology (ECT) review from the Plan Commission. Subsequent to such a review, this project will follow the standard development review process. A review will next take place at the Development Services, Planning and Engineering Committee, followed by a final review and decision from the Village Board of Trustees.

PROJECT DESCRIPTION & CONTEXT
The petitioner is proposing to install a 10.56 kW solar...

Click here for full text