During routine inspection at the 151st Street Lift Station, the Pump #1 motor end ball assembly (100 hp. motor) was found to be cracked.  This station services approximately 20% of the Village - pumping 2.6 million gallons of sewage per day.  To prevent a catastrophic failure, the pump was immediately taken out of service.  The manufacturer’s representative, Gasvoda & Associates, Inc., of Calumet City, Illinois, was contacted and the part placed on order due to the expected long lead time.  The part was replaced and reinstalled the week of May 17, 2010.  Additionally, the motor and rotating assembly were balanced.  The total cost for this work was $7,324.

 

On June 7, 2010, this item was reviewed and approved by the Public Works and Engineering Committee and referred to the Board for approval.

 

INFORMATION PREVIOUSLY PROVIDED AS PART OF THE JUNE 7, 2010, PUBLIC WORKS AND ENGINEERING COMMITTEE PACKET.

 

Financial Impact

This is a non-budgeted emergency repair.  There is a Board approved Contingency Fund (Account #031-6001-433.84-95) totaling $100,000 for this type of work.  Funds in the amount of $7,324 will need to be transferred from this account to Machinery and Equipment (Account #031-6003-433.43-20).

 

Recommended Action/Motion

I move to approve the transfer of $7,324 from the Contingency Account to the Machinery and Equipment Account;

 

And

 

Approve payment to Gasvoda & Associates, Inc., of Calumet City, Illinois, for the repair of the 151st Street Lift Station Pump #1 motor for an amount not to exceed $7,324.