File #: 2008-0511    Version: Name: 151st Street Lift Station Generator Exhaust - Proposal
Type: MOTION Status: PASSED
File created: 8/6/2008 In control: Board of Trustees
On agenda: 8/18/2008 Final action: 8/18/2008
Title: 151st Street Lift Station Generator Exhaust - Proposal
Attachments: 1. 151 LIFT STATION GENERATOR EXHAUST

Title

151st Street Lift Station Generator Exhaust - Proposal

History

In 2005, a building enclosing an emergency generator and controls was built at the 151st Street Lift Station (9100 West 151st Street).  The exhaust for the generator was routed through the rear (north) wall as is typical at all of our other sites.  Due to the large size of this diesel generator, a significant amount of black exhaust is generated.  Because the pipe is routed through the wall, the exhaust envelops the building giving the impression that it is on fire.  Numerous calls to Public Works and the Fire Department have resulted.

 

To accommodate the exhaust, proposals were obtained to reroute the exhaust through a faux chimney on the roof.  Directing the exhaust up will eliminate the impact from the building.

 

Two proposals were obtained for this unique work - Genco Industries, Inc. (the original contractor who built the building) of Crestwood, Illinois, submitted a price of $9,885 and Meccon Industries, Inc. of Lansing, Illinois, submitted a price of $15,231.  Therefore, it is recommended that the proposal from Genco Industries, Inc. of Crestwood, Illinois, be accepted.

 

On August 11, 2008, this item was reviewed and approved by the Public Works and Engineering Committee and referred to the Board for approval.

 

INFORMATION PREVIOUSLY PROVIDED AS PART OF THE AUGUST 11, 2008, PUBLIC WORKS AND ENGINEERING COMMITTEE PACKET.

 

Financial Impact

Account #031-6003-433.43-10 (Building) has a budgeted line item to cover the cost of this project.

 

Recommended Action/Motion

I move to approve accepting the proposal from Genco Industries, Inc. of Crestwood, Illinois, to reroute the generator exhaust at the 151st Street Lift Station for a cost not to exceed $9,885;

 

And

 

Approve authorizing the Village Manager to execute the proposal/contract.