header-left
File #: 2019-0168    Version: Name: John Humphrey Renovation (re-issue) RFP Award #19-002
Type: MOTION Status: PASSED
File created: 2/27/2019 In control: Board of Trustees
On agenda: 3/18/2019 Final action: 3/18/2019
Title: John Humphrey Renovation (re-issue) RFP Award #19-002
Attachments: 1. Audit Report, 2. Tabulation, 3. Tabulation with Alternates, 4. Signed Contract, 5. Unit Pricing Sheets
Title
John Humphrey Renovation (re-issue) RFP Award #19-002

History
A Request for Proposals for the John Humphrey Complex Renovation was re-issued on January 7, 2019 by the Parks & Grounds Department. The RFP was opened on February 7, 2019. The RFP was posted on Bid Net and was matched to four hundred and twenty vendors (420). Information was downloaded fifty six (56) times with twelve (12) being complete downloads. A total of four (4) proposals were submitted for the project. Staff reviewed the submitted proposals and evaluated each based on criteria that was identified in the RFP - cost (40%), past performance (10%), physical and economic experience (20%), organizational/managerial capacity (15%) and experience/reputation (15%).

Geotechnical sampling was discussed and is being scheduled to further identify any soil conditions that could potentially increase the costs of the project. In the event the geotechnical report determines that the site soil base needs to be augmented, either with additives installed to stabilize the base or materials removed and replaced with new materials, the overall costs could substantially increase.

Proposals were reviewed in great detail and based on this interview, as well as the Village’s long and successful history with V3 projects, staff recommends awarding the RFP to V3 Construction Group Ltd. The scope of the project was proposed at $1,163,000. Alternative options for the project that staff recommends are the installation of the backstop netting and homerun fencing on fields one (1) through five (5) for a cost of $445,377, bringing the total project cost to $1,608,377. Staff is requesting a contingency budget of ten percent (10%), which equates to $160,838 to address any unforeseen issues that could arise on a project of this scope.

On March 4, 2019, this item was reviewed by the Parks & Recreation Committee, recommended for approval, and referred to the Village Board of Trustees for consideration.

Financial Im...

Click here for full text