Legislation Details

File #: 2024-0329    Version: 0 Name:
Type: REPORT Status: PLACED ON FILE
File created: 4/26/2024 In control: Ad Hoc Ethics Committee
On agenda: Final action:
Title: /Name/Summary Starbucks Coffee - 14209 LaGrange Road - Drive -Through Accessories, 4 Bollards and Pavement Graphics
Date Ver.Action ByActionResultAction DetailsMeeting Details/Media Packet
No records to display.
Title/Name/Summary
Starbucks Coffee - 14209 LaGrange Road - Drive -Through Accessories, 4 Bollards and Pavement Graphics

History
QUICKFACTS

Project
Starbucks Coffee - Drive -Through Accessories, 4 Bollards and Pavement Graphics - 2024-0329

AR-24-00425

Petitioner
Nina Berg

Purpose
The petitioner is proposing to install a drive-through clearance bar, a canopy, 4 bollards, and add pavement graphics at the Starbucks located at 14209 LaGrange Road.

Requested Actions: Appearance Review

Project Attributes
Address: 14209 LaGrange Road

P.I.N: 27-03-300-019-0000

Parcel Size: 44,295 Square Feet
Building Size: 2,000 Square Feet

Comprehensive Plan Planning District: Downtown
Comprehensive Land Designation: Downtown Mixed Use

Existing Zoning: Village Center District
Existing Land Use: Restaurant

Surrounding Land Use:
North: Village Center District (P.F. Chang’s)
South: Village Center District (First American Bank)
East: Village Center District (Retail Shopping Center)
West: Village Center District (CVS and The University of Chicago Medicine Center for Advanced Care)

PROJECT DESCRIPTION & CONTEXT
The petitioner proposes to modify the site by installing a clearance bar, a shade canopy, 4 bollards, and applying graphics to the parking lot to assist with vehicular traffic.

The clearance bar will be installed in the drive-through, near the menu board. The height of the clearance bar will be 10’3”. In front of the clearance bar will be one non-illuminated bollard. Three non-illuminated bollards will be installed in the parking lot for parking signage. The clearance bar meets the requirements listed in 6-307.D.16.

A canopy will be installed over the preview board/order conformation point in the drive-through. The canopy will be 10’3” in height. The canopy is permitted to be installed in the building setback area as it meets the design standards listed in 6-212.E.1.g.

Overall, the project conforms to the Village’s Comprehensive Plan, Land Development Codes an...

Click here for full text