Title/Name/Summary
Verizon Wireless - 15501 Park Station Blvd. - Re-install equipment on water tank/Remove ballast frame temp tower
History
QUICKFACTS
Project
Verizon Wireless - 15501 Park Station Blvd - Appearance Review
Legistar Case 2024-0487
AR-24-00442
Petitioner
Eric Lennington, Terra Consulting Group for Verizon
600 Busee Highway, Park Ridge IL 60068
Purpose
The purpose of this petition is to reinstall antennas and antenna related equipment onto the Water Tower #8, that were previously removed when the Village Water Tower was painted.
Requested Actions: Appearance Review
Project Attributes
Address: 15501 Park Station Blvd, Orland Park, IL 60467
P.I.N.(s): 27-17-401-004-0000
Parcel Size: 0.52 acres
Comprehensive Plan Planning District: Centennial
Comprehensive Land Designation: Community and Institutional
Existing Zoning: MFG Manufacturing
Existing Land Use: Village Water Tower
Surrounding Land Use:
North: Open Space and R-4 -Vacant and Sheffield Square
South: Open Space - Centennial Park West and Metra Parking Lot
East: Open Space - Metra Parking Lot
West: Open Space - Metra Parking Lot
PROJECT DESCRIPTION & CONTEXT
When Water Tower #8 was painted by Village, the petitioner relocated existing antennas and antenna-related equipment located on the water tower to a ballast framed temporary tower. Petitioner now intends to move the equipment from the temporary existing ground mounted ballast frame tower and re-install them on the water tower. The hybrid cables connecting the existing ground mounted equipment to the water tower will be routed via the existing underground conduits. The hybrid cables will then be routed up the tower interior to the proposed raycap junction boxes on top of the tower. The ballast frame temporary tower is to be removed in its entirety from the property, and the surrounding area to be restored to its former condition.
PLANNING OVERVIEW
The petitioner is proposing performing the following work on the ground and upon t...
Click here for full text