Legislation Details

File #: 2024-0487    Version: 0 Name:
Type: MOTION Status: PLACED ON FILE
File created: 6/18/2024 In control: Board of Trustees
On agenda: Final action:
Title: /Name/Summary Verizon Wireless - 15501 Park Station Blvd. - Re-install equipment on water tank/Remove ballast frame temp tower
Attachments: 1. 2021.04.26 Structural Analysis Report for Verizon, 2. 2024.07.26 - CBBEL Approval L1.072324, 3. VZW PM - Rt 7 and West- Orland Park WT - Final CDs 042324.APPROVED. pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details/Media Packet
No records to display.
Title/Name/Summary
Verizon Wireless - 15501 Park Station Blvd. - Re-install equipment on water tank/Remove ballast frame temp tower

History
QUICKFACTS

Project
Verizon Wireless - 15501 Park Station Blvd - Appearance Review
Legistar Case 2024-0487
AR-24-00442

Petitioner
Eric Lennington, Terra Consulting Group for Verizon
600 Busee Highway, Park Ridge IL 60068

Purpose
The purpose of this petition is to reinstall antennas and antenna related equipment onto the Water Tower #8, that were previously removed when the Village Water Tower was painted.

Requested Actions: Appearance Review

Project Attributes
Address: 15501 Park Station Blvd, Orland Park, IL 60467

P.I.N.(s): 27-17-401-004-0000

Parcel Size: 0.52 acres

Comprehensive Plan Planning District: Centennial
Comprehensive Land Designation: Community and Institutional
Existing Zoning: MFG Manufacturing
Existing Land Use: Village Water Tower

Surrounding Land Use:
North: Open Space and R-4 -Vacant and Sheffield Square
South: Open Space - Centennial Park West and Metra Parking Lot
East: Open Space - Metra Parking Lot
West: Open Space - Metra Parking Lot


PROJECT DESCRIPTION & CONTEXT
When Water Tower #8 was painted by Village, the petitioner relocated existing antennas and antenna-related equipment located on the water tower to a ballast framed temporary tower. Petitioner now intends to move the equipment from the temporary existing ground mounted ballast frame tower and re-install them on the water tower. The hybrid cables connecting the existing ground mounted equipment to the water tower will be routed via the existing underground conduits. The hybrid cables will then be routed up the tower interior to the proposed raycap junction boxes on top of the tower. The ballast frame temporary tower is to be removed in its entirety from the property, and the surrounding area to be restored to its former condition.


PLANNING OVERVIEW
The petitioner is proposing performing the following work on the ground and upon t...

Click here for full text