Legislation Details

File #: 2024-0505    Version: 0 Name:
Type: REPORT Status: PLACED ON FILE
File created: 6/28/2024 In control: Committee of the Whole
On agenda: Final action:
Title: /Name/Summary Kruse Education Center -7617 Hemlock Drive -Installation of Gazebo
Attachments: 1. Plans
Date Ver.Action ByActionResultAction DetailsMeeting Details/Media Packet
No records to display.
Title/Name/Summary
Kruse Education Center -7617 Hemlock Drive -Installation of Gazebo

History
QUICKFACTS

Project
Kruse Education Center -7617 Hemlock Drive -Installation of Gazebo
2024-0505/ AR-24-00446

Petitioner
Community Consolidated School District
Matthew Shanahan - Director of Buildings and Grounds

Requested Actions
Appearance Review

Purpose
The petitioner is requesting to install a 12'x20' gazebo on top of 12"x42" concrete footings along the north side of the pond.

Project Attributes
Address: 7617 Hemlock Drive
P.I.N. (s): 27-13-101-002
Parcel Size: 7.9 acres
Building Size: 55,000 sq. ft.

Zoning and Land Use
Comprehensive Plan Planning District: Silver Lake South
Comprehensive Land Designation: Community & Institutional
Existing Zoning: R-3
Existing Land Use: School

Project Description & Context
7617 Hemlock Drive, also known as Kruse Education Center, is a 7.9 acre site. The approximately half of the site is open space with a baseball diamond along the west of the site, two parking lots on the northeastern portion of the site, and a water retention pond to the south of the site. A new gazebo is being proposed to the north of the water retention pond. The proposed 12'x20' gazebo will be installed atop of six 12"x42" concrete footings. The proposed gazebo is 100% premium cedar lumber and the roof will be coffee colored while the legs of the gazebo is a natural cedar stain color.

According to section 6-302.C.28 of the Land Development Code, gazebos may be permitted in side and rear setbacks in all districts except the BIZ General Business District, Village Center District, and MFG Manufacturing District, so long as they are located at least 5' within the lot lines and do not obstruct storm water flow. Development Services has determined the conditions have been met.

No other changes are being proposed to the site.

Overall, the project conforms to the Village’s Comprehensive Plan, Land Development Code, and policies for this ar...

Click here for full text