Legislation Details

File #: 2024-0643    Version: 0 Name:
Type: MOTION Status: PLACED ON FILE
File created: 8/14/2024 In control: Board of Trustees
On agenda: Final action:
Title: /Name/Summary Superior Holdings LLC - 13341Southwest Highway - new Access Driveway
Attachments: 1. 4169 IL 7 at 13341IL 7 Orland Park Cook (3rd Review) (003), 2. 13341 Southwest Highway Access Dr Tech memo_2023.09.15, 3. 13341 Southwest Highway_ Application, 4. Added Landscape Page from 13341 SW Hwy Access Drvieway - Permit Plans 2024.09.09 - BCE Appearance Review.rfs, 5. PARCEL 0ME0006 - IDNR OWR DRIVEWAY PERMIT PLANS.rfs
Date Ver.Action ByActionResultAction DetailsMeeting Details/Media Packet
No records to display.
Title/Name/Summary
Superior Holdings LLC - 13341Southwest Highway - new Access Driveway

History
QUICKFACTS

Project
13341Southwest Highway - new Access Driveway
Legistar ID: 2024-0643
AR-00465

Petitioner
Kevin Nemeh, Superior Holdings, LLC

Purpose
The purpose of this petition is to construct a new driveway between an existing parking lot and Southwest Highway (IL Route 7). This request is in coordination with IDOT - Land Acquisition, and related to IDOT’s Highway Plan Improvement, Contract No. 62H82.

Requested Actions: Appearance Review

Project Attributes
Address: 13341Southwest Highway

P.I.N.(s): 23-34-402-006-0000 & 23-34-402-006-0000

Size: 2.02 acres (before IDOT Acq.) 1.919 (after IDOT Acq.)

Comprehensive Plan Planning District: Sandburg Planning District
Comprehensive Land Designation: Manufacturing
Existing Zoning: MFG District
Existing Land Use: Manufacturing

Surrounding Land Use:
North: MFG District
South: MFG District
East: E-1 Estate Residential District (Palos Country Club)
West: E-1 Estate Residential District

PROJECT DESCRIPTION & CONTEXT
The petitioner is requesting an appearance review to facilitate IDOT in constructing a driveway between the existing parking lot at the subject property and Southwest Highway (IL Rte 7).

The proposed driveway will align with the centerline of the existing drive aisle and will be 35’ wide. IDOT will install a 100’ long 12’x8’ box culvert under the proposed driveway. IDOT will install a new curb and gutter with guardrail along the driveway; and will seed the disturbed areas.

A portion of the property along Southwest Highway, including the six existing parking spaces, will no longer be available for parking due to the limits of IDOT’s fee simple acquisition, and will be maintained by IDOT for the construction and maintenance of IDOT’s retaining wall that is being constructed along Southwest Highway for the conveyance to Mill Creek.

The removal of these parking spaces will bring the parking lot i...

Click here for full text