Legislation Details

File #: 2025-0413    Version: 0 Name:
Type: MOTION Status: PLACED ON FILE
File created: 5/14/2025 In control: Board of Trustees
On agenda: Final action: 5/19/2025
Title: GT Express - 11351 183rd Street EV Charging Stations - Appearance Review
Attachments: 1. Site Plan, 2. Pulsar-Pro EV Charger Technical Data Sheet, 3. Map, 4. Pulsar-Pro EV Charger
Date Ver.Action ByActionResultAction DetailsMeeting Details/Media Packet
No records to display.
Title
GT Express - 11351 183rd Street EV Charging Stations - Appearance Review
History
Project Attributes
Requested Actions: Appearance Review

Address: 11351 183rd Street
P.I.N.(s): 19-09-06-201-042; 19-09-06-201-043; 19-09-06-201-044
Parcel Size: 4.77 acres
Building Size: 18,768 square feet

Comprehensive Plan Planning District: I-80 Employment Planning District
Comprehensive Land Designation: Office Employment Emphasis
Existing Zoning: ORI Mixed Use District
Existing Land Use: Commercial Production/Distribution/Warehouse

Surrounding Land Use
North: R4 Residential - The Preserves of Marley Creek Subdivision
South: Unincorporated- JT Einoder Vacant Property
East: ORI Mixed Use District - Distinctive Drive Office Park
West: ORI Mixed Use District - Multi-tenant Commercial

Preliminary Engineering: N/A

Planning Overview
The petitioner proposes to install 10 electric vehicle supply equipment stations (EVSE) for vehicle-to-grid (V2G) parking spaces in the front parking lot of 11351 183rd Street, specifically at the western side of the lot closest to the building. A row of 10 EVSE’s will reduce the total number of vehicle parking spaces from to 37 to 27, however, the parking for this site is legal non-conforming and is not expected to have any parking shortages. Per Section 6-306.N.1.e, V2G parking spaces may be used by regular automobiles if no other parking spaces are available. Additionally, the Applicant could restripe the rear outdoor storage area to add additional parking if the overall parking demand increases at the site.

Mechanicals/Utility Conduits
Per the Land Development Code, "All associated and ancillary equipment, batteries, devices, structures or support(s) for EVSE shall be screened from the public right-of-way with low native landscaping. Cables, wires and other transmission conduits or lines, with the exception of the actual EVSE to vehicle plug/ adapter cable, providing connections from the EVSE to the electrical distribution point or to b...

Click here for full text