Legislation Details

File #: 2024-0222    Version: 0 Name:
Type: REPORT Status: PLACED ON FILE
File created: 3/20/2024 In control: Ad Hoc Ethics Committee
On agenda: Final action:
Title: /Name/Summary Center School - 9407 W 151st Street - Playground Removal and Replacement
Attachments: 1. Center School Submittal
Date Ver.Action ByActionResultAction DetailsMeeting Details/Media Packet
No records to display.

Title/Name/Summary

Center School - 9407 W 151st Street - Playground Removal and Replacement

History

Project

Center School Playground Removal and Replacement

 

AR-24-00414

2024-0222

 

Petitioner

Ted Schulz - Director of Buildings and Grounds

Lori Vierow - Senior Landscape Architect

 

Purpose

The purpose of this petition is to remove the existing playground equipment and replace it with new playground equipment at the site located at 9407 W 151st Street.

 

Requested Actions:  Appearance Review

 

Project Attributes

Address: 9407 W 151st Street

P.I.N: 27-15-100-028-0000

Lot Size: .20 acres

 

Comprehensive Plan Planning District: Regional Core

Comprehensive Land Designation: Regional Mixed Use

Existing Zoning: COR Mixed Use District

Existing Land Use: School

 

PROJECT DESCRIPTION & CONTEXT

The petitioner is proposing to remove the existing playground equipment and install new playground equipment. The site is currently being used as a school, and the playground area is in the center of the parcel behind the school building.

 

Overall, the project conforms to the Village’s Comprehensive Plan, Land Development Code and policies for this area.

 

MOBILITY

There are no changes to the parking lot for this appearance review.

 

SITE PLAN

Play Area

The existing bench and picnic table will be removed  and replaced with new similar materials.  In addition, the existing play apparatus, independent play components, climbers, and slides will be removed and replaced along with the existing footings and mulch. Likewise, the poured in place rubber element will be removed and replaced in the same location. The tuff timber element that enclosures the playground and mulch will be removed temporarily but reinstalled once play apparatus and mulch elements have been installed. A new 18'x18' shade shelter with blue color fabric  will be installed with on the northern most part of the playground area.                                                                                       

 

The existing spinner, senor wall, and playhouse will remain.

 

There are no proposed changes to the existing asphalt and concrete. In addition, there are no changes to the existing fence on site.

 

Fences

All temporary fences shall not remain longer than 6 months. The proposed snow fence and slit fence will enclose only the playground area and are going to be used to prevent erosion during the construction of the play area. The Land Development Code allows for temporary slit fences when they are used for the purposes of erosion control during construction and soil stabilization.

 

Accessory Structure 

Playgrounds are permitted detached accessory structure that is a permitted use in the COR Mixed Use District. They are allowed in the side and rear setbacks located at least 5 feet within the lot lines and do not obstruct storm water flow.

 

Recommended Action/Motion

The Appearance Review for " Center School Playground Removal and Replacement " located at 9407 W 151st Street, case number 2024-0222, has been administratively approved on March 28th, 2024 subject to the conditions:

1.                     The development will be in substantial conformance with the Site Plan dated January 17th, 2024.

2.                     Meet all Building and Land Development Code requirements

3.                     Obtain the necessary permits from the Village’s Building Division prior to initiating work.