File #: 2026-0754    Version: 0 Name: Rebuild Illinois Roadwork Phase 2 - ITB #26-053
Type: MOTION Status: IN BOARD OF TRUSTEES
File created: 7/24/2026 In control: Board of Trustees
On agenda: 8/3/2026 Final action:
Title: Rebuild Illinois Roadwork Phase 2 - ITB #26-053
Attachments: 1. ITB 26-053 - Bid Compliance Summary, 2. Schedule of Prices - Austin Tyler, 3. Schedule of Prices - D Construction, 4. Schedule of Prices - Davis Concrete, 5. Schedule of Prices - Gallagher Asphalt, 6. Schedule of Prices - Lindahl Brothers, 7. Schedule of Prices - M&J Asphalt, 8. Schedule of Prices - McGill Construction, 9. Schedule of Prices - PT Ferro

Title

Rebuild Illinois Roadwork Phase 2 - ITB #26-053

 

History

The Rebuild Illinois (RBI) Roadwork Program includes the maintenance and reconstruction of various roadways/streets throughout the Village. Between May 2020 and September 2022, the Village received a total of $3,741,168.66 in six (6) installments of $623,258.11 each. The Engineering Department used some of these funds for various projects, leaving a balance of $1,247,056.22. The Illinois Department of Transportation (IDOT) is requiring the remaining RBI money to be spent in 2026, or it will need to be returned. The RBI Roadwork Program will utilize these funds.

 

On April 6, 2026, the Board approved Rebuild Illinois Roadwork Phase 1, for improvements to the Catalina East neighborhood, including Evergreen Drive, Aubrieta Lane, and 153rd Street (between 73rd Avenue and Catalina Drive), as well as 152nd, 153rd, and 154th Streets (between 73rd Avenue and Harlem Avenue). The total cost of the project was $432,369.50, leaving a balance of $814,686.72.

 

Under Rebuild Illinois Roadwork Phase 2, streets scheduled for resurfacing and reconstruction will utilize the remaining allocation. Streets to be improved are 80th Avenue (from 143rd Street to Binford Drive), West Avenue (from 143rd Place to 151st Street), and El Cameno Real Drive, Cordoba Court, and La Reina Street. In addition to pavement-related work, repair and/or replacement of hazardous sidewalks, failed curbs, and deteriorated storm sewer structures will be performed on an as-identified basis. In all project areas, all non-compliant sidewalks, most notably at street crossings, will be upgraded in accordance with the Americans with Disabilities Act (ADA).

 

To initiate this phase of the RBI Roadwork Program, Invitation to Bid (ITB) #26-053 Rebuild Illinois Roadwork Phase 2 was published on BidNet Direct from July 2, 2026, to July 23, 2026. During that time, forty-three (43) total interested bidders downloaded the documents, thirteen (13) vendors were local to Illinois, and bids were received from eight (8) contractors. A summary of the proposals is below:

 

D. Construction Inc. of Coal City, IL - $927,625.25

Lindahl Brothers, Inc. of Bensenville, IL - $968,649.25

Gallagher Asphalt Corporation of Thornton, IL - $977,000.00

M & J Asphalt Paving Company, Inc. of Cicero, IL - $979,947.25

Austin Tyler Construction, Inc. of Elwood, IL - $983,289.68

Davis Concrete Construction Co. of Monee, IL - $998,690.00

P.T. Ferro Construction Co. of Joliet, IL - $999,508.45

McGill Construction LLC of Frankfort, IL - $1,020,020.65

 

D. Construction Inc. was identified as the lowest responsible bidder Rebuild Illinois Roadwork Phase 2, with a submitted total project cost of $927,625.25.

 

This agenda item is being considered by the Committee of the Whole and the Village Board of Trustees on the same night.

 

Financial Impact

Funding in the amount of $814,686.72 for Rebuild Illinois Roadwork Phase 2 is available in the FY 2026 MFT account 2300000-571250. The balance of the bid, $112,938.53, will be funded by the Road Improvement Program (RIP) account 1008020-571250.

 

Recommended Action/Motion

I move to approve the contract with D. Construction Inc. for a total not-to-exceed contract price of $927,625.25, and as fully presented.

 

(Full motion - not necessary to be read)

 

I move to approve and authorize the execution of a Contractor Agreement between the Village of Orland Park and D. Construction Inc. of Coal City, IL, as the lowest cost qualified responsive bidder for ITB #26-053 Rebuild Illinois Roadwork Phase 2 for an amount not to exceed $927,625.25;

 

AND

 

Authorize the Village Manager to execute all related contracts, subject to Village Attorney review;

 

AND

 

Authorize the Village Manager to approve change orders related to this contract within the authorized amount.