Legislation Details

File #: 2024-0221    Version: 0 Name:
Type: MOTION Status: PLACED ON FILE
File created: 3/20/2024 In control: Board of Trustees
On agenda: Final action: 3/27/2024
Title: /Name/Summary Liberty Elementary School Playground Equipment Replacement
Attachments: 1. Liberty School Submittal
Date Ver.Action ByActionResultAction DetailsMeeting Details/Media Packet
No records to display.

Title/Name/Summary

Liberty Elementary School Playground Equipment Replacement

 

History

Project: Liberty Elementary School Playground Equipment Replacement - 2024-0221

Petitioner: Ted Schulz, Orland School District 135

Project Representative: Lori Vierow, PLA, JSD Professional Services, Inc.

Purpose: The petitioner seeks approval to demolish and reconstruct the playground on site.

Requested Actions: Appearance Review

 

Address: 8801 151st Street

P.I.N.: 27-15-201-020-0000

Parcel Size: 19.4 acres

Building Size: 56,494 square feet

 

Planning District: Silver Lake South Planning District

Planning Land Use Designation: Community and Institutional

Zoning District: R-3 Residential

 

Adjacent Properties:

North: R-3 Single Family Residential (Silver Lake West)

East: R-3 Single Family Residential (Orland Terrace)

South: R-3 Government (Water Pumping Station & Reservoir)

West: R-3 Single Family Residential (Village Square of Orland)

 

PROJECT DESCRIPTION

The petitioner proposes to install new playground equipment in the existing playground area at Liberty School located at 8801 151st Street. The existing playground is located to the southwest of the building.

 

Site Plan

The petitioner proposes to remove existing equipment and install new playground equipment in an expanded play area that will measure roughly 9,630 square feet in size.

 

As shown on the site plan and rendering, new playground equipment includes swings, a zipline, climbing equipment, and various other playground equipment. Engineered wood fiber surfacing (wood chips) will be installed within the playground area and contained with a tuff timber edge.

 

There are no other changes proposed to the site, including the fitness equipment located on the west side of the school.

 

Overall, the project conforms to the Village’s Comprehensive Plan, Land Development Codes and policies for this area.

 

Recommended Action/Motion

The Appearance Review for Liberty Elementary School, case number 2024-0221, as shown on the plan set titled “Liberty Elementary School Playground” dated January 17, 2024, has been administratively approved on March 27, 2024, subject to the following conditions:

 

1. Meet all building code related items.