ITB #26-021 Rebuild Illinois Roadwork - Award
History
The Rebuild Illinois (RBI) Roadwork Program includes the maintenance and reconstruction of various roadways/streets throughout the Village. Between May 2020 and September 2022, the Village received a total of $3,741,168.66 in six (6) installments, $623,258.11 each. Engineering used some of these funds for various projects, leaving a balance of $1,247,056.22. The Illinois Department of Transportation (IDOT) is requiring the remaining RBI money to be spent in 2026, or it will need to be returned. The RBI Roadwork Program will utilize these funds. The program is guided by the recommendations of the Village’s pavement management consultant, Applied Research Associates (ARA), in collaboration with Public Works staff’s extensive knowledge of Village roadways.
For FY2026, streets scheduled for resurfacing and reconstruction are found in the Catalina East neighborhood, streets included are Evergreen Drive, Aubrieta Lane, 153rd between 73rd Ave and Catalina Drive and 152nd, 153rd, and 154th streets between 73rd Ave and Harlem Ave. In addition to pavement-related work, repair and/or replacement of hazardous sidewalks, failed curbs, and deteriorated storm sewer structures will be performed on an as-identified basis. In all of the above project areas, all non-compliant sidewalks, most notably at street crossings, will be upgraded in accordance with the Americans with Disabilities Act (ADA).
To initiate the RBI Roadwork Program, a request for proposals ITB #26-021 Rebuild Illinois Roadwork was published on BidNet Direct from February 27, 2026 to March 25, 2026. During that time, thirty-nine (39) vendors downloaded at least one (1) of the proposal documents, twenty-eight (28) vendors were local to Illinois, and proposals were received from eleven (11) contractors. A summary of the proposals is below:
M&J Asphalt Paving Company Inc. of Cicero, IL - $619,450.22
Lindahl Brothers, Inc. of Bensenville, IL - $621,115.22
Davis Concrete Construction of Monee, IL - $629,619.22
Austin Tyler Construction Inc. of Elwood, IL - $638,840.40
McGill Construction Co. of Frankfort, IL - $643,188.52
Everlast Blacktop of Elgin, IL - $648,931.77
K-Five Construction Co. of Westmont, IL - $652,025.22
D Construction of Coal City, IL - $664,534.20
P.T. Ferro Construction of Joliet, IL - 675,311.52
Builders Paving LLC of Hillside, IL - $699,789.00
Gallagher Construction of Thornton, IL - $699,921.47
M&J Asphalt Paving Company Inc. of Cicero, IL was identified as the lowest responsible bidder for the RBI Roadwork Program with a submitted total project cost of $619,450.22 for 2026. This amount is below the engineer’s estimate. IDOT has also approved the Village to let out additional road areas for the remaining funds.
This agenda item is being considered by the Committee of the Whole and the Village Board of Trustees on the same night.
Financial Impact
Funding for RBI Road Work Program is available in the FY 2026 MFT account 2300000-571250.
Recommended Action/Motion
I move to recommend to the Village Board to approve and authorize the execution of a Contractor Agreement between the Village of Orland Park and M&J Asphalt Paving Company Inc. of Cicero, IL, as the lowest cost qualified responsive bidder for ITB #26-021, RBI Roadwork Program for an amount not to exceed $619,450.22.