Title: /Name/Summary Meadow Ridge School - Playground Removal & Replacement - 10959 159th Street
Date Ver.Action ByActionResultAction DetailsMeeting Details/Media Packet
No records to display.

Title/Name/Summary

Meadow Ridge School - Playground Removal & Replacement - 10959 159th Street

History

QUICKFACTS

Meadow Ridge School - Playground Removal & Replacement - 10959 159th Street

Petitioner

Ted Schulz - Director of Buildings/Grounds - Orland School District 135

Purpose

Playground removal and replacement. Removal of engineered wood fiber mulch surfacing and installation of synthetic turf and poured-in-place rubber surfacing.

 

Requested Actions:  Appearance Review

 

Project Attributes

Address: 10959 159th Street

P.I.N.: 27-20-100-008-0000

Size: 24.99 acres

 

Comprehensive Plan Planning District: Centennial Planning District

 

Comprehensive Land Designation: Community & Institutional

 

Existing Zoning: Large Scale Planned Development (LSPD)

 

Surrounding Land Use:

North: BIZ General Business District (Zeigler Auto Campus)

South: E-1 Estate Residential (Vacant land)

East: LSPD Large Scale Planned Development (Century Junior High School)

West: E-1 Estate Residential (Vacant Land)

 

PROJECT DESCRIPTION & CONTEXT

 

The Petitioner proposes to remove the existing playground equipment, install synthetic turf and pour-in-place rubber surfacing and install new playground equipment. The current playground occupies approximately 9,900 square feet on the southwest corner of the lot. The playground area will not be expanded or re-located.

 

DETAILED PLANNING DISCUSSION

The petitioner proposes to remove the existing playground equipment, replace the existing wood fiber mulch with synthetic turf and pour-in-place rubber surfacing, and install new playground equipment. The play area will remain in the same place and will continue its current size of approximately 9,900 square feet.

 

As shown on the site plan and rendering, the new playground equipment will include swings, slides, climbing structures, 2 music stations, and 2 spinning carousels.

There are no other changes proposed to the site. The playground area measures approximately 16 ft from the western lot line thereby meeting the setback requirements.

 

Fences

All temporary fences shall not remain longer than 6 months. The petitioner proposes to install a 6’ construction fence with one 20’ gate as an equipment entrance alongside an erosion control silt fence. Temporary slit fences used for the purposes for erosion control during construction is allowed under the Land Development Code Section 6-310.B.d.

 

Recommended Action/Motion

The Appearance Review for Meadow Ridge School Playground Removal & Replacement case number 2025-0289, as shown in the plans submitted by the petitioner on April 2, 2025, has been administratively approved on April 7, 2025, subject to the following conditions:

 

                     1) Secure a Building Permit and meet all Building Code requirements.