Title: /Name/Summary AVIS Budget Car Rental -7412 159th Street- Electrical Vehicle Charging Stations Appearance Review
Date Ver.Action ByActionResultAction DetailsMeeting Details/Media Packet
No records to display.

Title/Name/Summary

AVIS Budget Car Rental -7412 159th Street- Electrical Vehicle Charging Stations Appearance Review

 

History

QUICKFACTS

Project

AVIS Budget Car Rental -7412 159th Street- Electrical Vehicle Charging Stations 

2024-0014/AR-23-00398

 

Petitioner

Mike Belke

Denise Poremba

 

Purpose

The petitioner seeks to add car charging stations to the building exterior located at 7412 159th Street

 

Requested Actions:  Appearance Review

 

Project Attributes

Address: 7412 159th Street, Orland Park, IL, 60462

P.I.N.(s): 27-13-410-009-0000

Parcel Size: .66 acres

Building Size: 2,500

 

Comprehensive Plan Planning District: 159th & Harlem

Comprehensive Land Designation: Neighborhood Mixed Use

Existing Zoning: BIZ

Existing Land Use: Senior Living

 

Preliminary Engineering:  N/A

 

Planning Overview

Avis Budget Car Rental proposes to install 2 Evercharge Level 2 EVSE car charging stations at the site. Both proposed exterior charging stations are located on the building north elevation.

 

Overall, the project conforms to the Village’s Comprehensive Plan, Land Development Codes and policies for this area.

 

SITE PLAN

According to section 6-306.N of the Land Development Code, EVSE technologies must meet and comply with the most up to date provisions of the National Electrical Code for Level 2 conductive power stations and be approved by Underwriters Laboratories. The petitioner has proposed two exterior wall mounted car charging stations at the site. Both of the proposed charging stations have a power output of 48A.

 

Mechanicals/Utility Conduits

Per the Land Development Code, " All associated and ancillary equipment, batteries, devices, structures or support(s) for EVSE shall be screened from the public right-of-way with low native landscaping. Cables, wires and other transmission conduits or lines, with the exception of the actual EVSE to vehicle plug/ adapter cable, providing connections from the EVSE to the electrical distribution point or to buildings or non-vehicle batteries must be installed underground." The proposed exterior car charging stations are not visible from the public right of way, and the petition has proposed to have all conduits installed at two panel boxes, one interior and one exterior.

 

Electric Utility Interface

ComEd Usage data for the site details that the highest month peak load occurred in July/August 2023 with a demand of 13.38kW. The power from the existing service panel available for EV charging is 92.49kW. At full charge rate the two proposed 48A EV chargers will use 23.04 kW of power. The additional car charging ports will add a load of approximately 92.4kW or 256.6 amps. The system can safely handle another 69.45kW.

 

 

Recommended Action/Motion

The Appearance Review for the Avis Budget Rental LLC case number 2024-0014, as shown on the site plans, submitted by the petitioner on January 4th, 2024, has been administratively approved on January 8th, 2024, subject to the following conditions: 

 

1.                     A building permit must be obtained from the Village's Building Department prior to initiating work;

2.                     Meet all Building and Land Development Code requirements at the site.