Legislation Details

File #: 2025-0235    Version: 0 Name:
Type: MOTION Status: DRAFT
File created: 4/9/2025 In control: Committee of the Whole
On agenda: Final action:
Title: /Name/Summary: SBA Communications & Orland Park Fire District Cell Tower. - 10730 163rd Place - Decommission Cell Tower
Date Ver.Action ByActionResultAction DetailsMeeting Details/Media Packet
No records to display.

Title/Name/Summary:

SBA Communications & Orland Park Fire District Cell Tower. - 10730 163rd Place - Decommission Cell Tower

History:

In 1998, the cell tower was upgraded from an existing 100’ tall tower to a new 140’ tall tower. Also, at that time, a 20’ by 11’ utility building was located at the base to provide power and connections to the antenna.

In 2009, three “Clearwire” microwave dish antennae were placed on the existing monopole and a “Clearwire” GPS device was added to the utility building. 

Petitioner is now requesting an appearance review for the purpose of decommissioning the tower and removing the surrounding ancillary items (i.e.: shelter, chain link fence, concrete pad, and utility pedestal).

Quick facts -

Project: SBA Communications & Orland Park Fire District Cell Tower. - 10730 163rd Place - Decommission Cell Tower

Petitioner: DP Schweihofer Excavating

Petitioner Contact: David Schweihofer

Purpose: Decommission of communication site. Removal of monopole cell tower, shelter, chain link fence, concrete pad, and utility pedestal.

Requested Actions: Appearance Review for Decommission of Tower & Lot

Project Attributes:

Address: 10730 163rd Place

P.I.N.(s): 27-20-400-011-8002

Size: 0.024 acre, 22’ x 47.8’ lot (per the petitioner, this is the area encompassing cell tower and related equipment). This tower sits on the campus of the Orland Fire Protection District Training Center.

Comprehensive Plan Planning District: Centennial

Comprehensive Land Designation: Community and Industrial

Existing Zoning: MFG - Manufacturing & Industrial

Surrounding Land Use:

North: E-1 Estate Residential & MFG Manufacturing & Industrial

South: MFG Manufacturing & Industrial

East: MFG Manufacturing & Industrial

West: OS Open Space & E-1 Estate Residential

 

PROJECT DESCRIPTION & DETAILED PLANNING DISCUSSION

The petitioner is proposing decommission of the existing communication site. The scope of work includes the removal of:

•                     140’ tall monopole cell tower

•                     20’ x 11’ shelter/utility building

•                     8’ high chain link fence

•                     concrete pad removal to a depth of 1 foot

•                     utility pedestal. 

 

The petitioner will restore the area to its natural grade and condition after the work is completed.

 

Overall, the project conforms to the Village’s Comprehensive Plan, Land Development Codes and policies for this area.

 

Recommended Action/Motion

The Appearance Review for the SBA Communications/Orland Park Fire District Cell Tower Decommission, case number 2025-0235, as shown in the plan titled: “Decommission of SBA cell tower” submitted on March 17, 2025, has been administratively approved on March XX, 2025, subject to the following conditions:

 

1)                     Restore the area to its natural grade and condition.

2)                     Meet all building code related items.