Skip to main content
header-left
File #: 2017-0843    Version: Name: Fees for Permits and Inspections Title 5 Chapter 2 - Ordinance
Type: MINUTES Status: PASSED
File created: 11/14/2017 In control: Board of Trustees
On agenda: 12/4/2017 Final action: 12/4/2017
Title: /Name/Summary AN ORDINANCE AMENDING TITLE 5, CHAPTER 2 OF THE VILLAGE CODE OF THE VILLAGE OF ORLAND PARK relating to building permits and fees
Attachments: 1. Ordinance, 2. EXHIBITS A THROUGH E, 3. Title 5 Chapter 2 Fees, 4. Commercial Construction Cost Comparison, 5. Commercial Fee Comparisons, 6. Residential Construction Cost Comparison, 7. Typical SFR 2017- Fee Spread
Title/Name/Summary
AN ORDINANCE AMENDING TITLE 5, CHAPTER 2 OF THE VILLAGE CODE OF THE VILLAGE OF ORLAND PARK relating to building permits and fees
Body
WHEREAS, the Village of Orland Park is authorized by law to adopt codes by reference pursuant to Illinois Municipal Code, 65 ILCS 5/1-3-2; and

WHEREAS, from time to time the Village determines that further changes are necessary to the text of the Village’s adopted Building Code, said changes relating to building permit and review fees; and

WHEREAS, the Village has determined that the amendments set out below are in the best interests of the Village and its residents and will enhance the public safety and welfare.

NOW, THEREFORE, Be It Ordained by the President and Board of Trustees of the Village of Orland Park, Cook and Will Counties, Illinois, as follows:

SECTION 1

Section 5-2-5-2 of the Village Code of the Village of Orland Park is hereby amended to delete in its entirety the text of Section 5-2-5-2 and to substitute the following as new text for Section 5-2-5-2:

5-2-5-2: Final Plan Review Fees Shall Be As Follows:

a. New Single Family Residence: $ 420.00
b. New Single Family Residential energy reviews required per Illinois Code: $ 75.00
c. Single Family Additions and remodeling, when adding less than 50% to the floor area of the residence: $ 150.00
d. Single Family Addition energy reviews per state of Illinois Code: $75.00
e. Commercial construction, including remodeling for a new and existing tenant. (see note):

Insert Exhibit A

Note:
Assembly, Institutional and Mall building reviews are 1.5 times the base fee schedule.
Electrical, Plumbing, Mechanical, Energy, Accessibility, Health and Fire Code (Table f.) review fees (when required) are each 30% of a building plan review fee but not less than $30.00 each.

f. Fire Sprinkler Plan Review Fee:

Insert Exhibit B

f1. Fire Alarm Plan Review Fee:

Insert Exhibit C

f2. Kitchen Hood, Duct and Suppression Plan Review Fee: $20...

Click here for full text