Title
CPAC Modernization Phase 2 and OPHFC Pool Renovation Projects - RFP 25-001
History
On November 11, 2025, the Village issued Request for Proposal (RFP) 25-001 “CPAC Modernization Phase 2 and OPHFC Pool Renovation Projects” requesting proposals for improvements at both the Centennial Park Aquatic Center (CPAC) and the Orland Park Health and Fitness Center (OPHFC). The summary of the scopes of work for both projects is provided below:
CPAC Modernization Phase 2 Project
The scope of work for the CPAC Modernization Phase 2 Project includes expansion of the pool pump building and replacement of pool operating equipment; expansion of the pump pit and mechanical room; construction of a new underground surge tank, chlorine room, electrical room, and storage room; demolition of existing restrooms and construction of enlarged restroom facilities; and installation of a new cooling room for lifeguards. The full scope of work for the CPAC Modernization Project is based on the “2023 Centennial Park Aquatic Center Facility Condition Assessment”. Phase 1 of the (CPAC) Modernization Project was completed in May 2025.
OPHFC Pool Renovation Project
The scope of work for the OPHFC Pool Renovation Project includes expansion and renovation of the pool pump room and replacement of pool equipment, and construction of a new underground surge tank, chlorine room, storage room and replacement of floor drains and piping in men’s locker room corridor, replacement of existing pool lighting, refinishing of pool and repairing spa leaks. The impetus for this project was based on the advanced age and dilapidated condition of the existing equipment versus a formal condition assessment.
During the eight (8) weeks that the solicitation was open for review, seventy-eight (78) firms downloaded either partial or complete document packages. RFP 25-001 was opened on January 6, 2026, at which point four (4) firms submitted proposals. Per the RFP documents, the Village has the option to select...