Doogan Park Construction Engineering Services
History
RFP #24-059 “Doogan Park Construction Engineering Services” (attached) was issued on August 15, 2024, for design, engineering and construction document services for the redevelopment of Doogan Park.
The Doogan Park project includes complex challenges including permitting (MWRD, ACOE and others), the determination of the soccer field as natural grass or artificial turf, stormwater detention, expanded and improved parking, the impact of sound from pickleball play, site security including the Brown Park tunnel, sewer and water for the restroom building, the location of the transformer and other site amenities.
The approved elements of the renovation include: ten pickleball courts, two tennis courts, two bocce ball courts, a half basketball court, a 60’ baseline baseball field, a full-size 360'x 210' soccer field, playground, 30'x40' shelter with restrooms, a pavilion, sledding hill, infrastructure to add lights to the pickleball courts at a later time, an expanded parking lot on the north and squared off parking lot on the south. The existing south pavilion, oak trees, frisbee golf course and paths are intended to remain intact, however, final design may impact the frisbee course and/or paths.
This project has been awarded a $600,000 Open Space Lands Acquisition and Development (OSLAD) grant through the Illinois Department of Natural Resources (IDNR) in support of the elements described above.
Six (6) proposals (attached) were received by the September 5, 2024, deadline as summarized below. All, except CBBEL included the lighting infrastructure in the quote as specified in the RFP Scope of Work.
Planning Resources Inc: $168,520.00
Bollman Engineering, PLLC: $231,657.00
Wight and Company: $239,500.00
Christopher B. Burke Engineering, Ltd (CBBEL) $263,115.00
$277,915.00 w/lighting infrastructure
EVA Design and Engineering, LLC: $264,000.00
Gewalt Hamilton Asso...