File #: 2019-0001    Version: Name: Centennial Park Aquatic Center Vertical Turbine Pump Replacement Phase II
Type: MOTION Status: PASSED
File created: 12/19/2018 In control: Board of Trustees
On agenda: 1/21/2019 Final action: 1/21/2019
Title: Centennial Park Aquatic Center Vertical Turbine Pump Replacement Phase II
Attachments: 1. Bid Resp Check 18-010, 2. CPAC Vertical Turbine Pump Replacement, 3. Bid Tab Vertical Turbine Pump Repair, 4. ITB 18-010 EXHIBIT C Specifications, 5. ITB 18-010 Exhibit D - Pump Room Engineering Drawing, 6. 18-010 Chicagoland Construction Bid Summary, 7. Signed Contract
Title
Centennial Park Aquatic Center Vertical Turbine Pump Replacement Phase II


History
Request waiving the bid process and award the purchase and installation of the Vertical Turbine replacement pumps in the original mechanical room for Flume Pump 1, Flume Pump 2 and the Water Play Feature Pump to Crossroad Construction of Lombard, IL. Crossroad Construction is the company that actually performed the work for the first two pump replacements in the mechanical room in 2018. All work specified in ITB 18-010 was not performed due to budgetary constraints. Crossroad Construction is willing to hold the pricing from ITB 18-010. Work will follow the specified requirements listed in ITB 18-010. Bid pricing was submitted for Flume Pump 1 at $37,500.00, Flume Pump 2 $ 37,500.00 and the Water Play Feature Pump at $30,300.00 for a total of $105,300.00 By waiving the bid process it allows the Village to utilize the open permit issued by the Illinois Department of Public Health (IDPH) for the work that is valid until May of 2019. This saves the permitting fees and the time for the issuance of the permit. The most recent permit that was received from the Illinois Department of Public Health (IDPH) took over four (4) months to receive. This also allows the work to begin this winter allowing ample time for completion prior to the opening of the Aquatic Center 2019 season. Crossroads Construction has performed multiple projects at the Aquatic Center and has always provided a quality product.

Staff recommends waiving the bid process and awarding the Centennial Park Aquatic Center Vertical Turbine Pump Replacements Phase II to Crossroads Construction of Lombard, IL for a total bid price of $105,300.00.

On January 7, 2019, this item was reviewed by the Parks & Recreation Committee, recommended for approval, and referred to the Village Board of Trustees for consideration.


Financial Impact
Funds for the Centennial Park Aquatic Center Vertical Turbine Pump Replacement are bud...