header-left
File #: 2020-0138    Version: 0 Name: Consulting Engineering Services for 151st Street Lift Station Improvements - Proposal
Type: MOTION Status: PASSED
File created: 2/18/2020 In control: Board of Trustees
On agenda: 3/16/2020 Final action: 3/16/2020
Title: /Name/Summary Consulting Engineering Services for 151st Street Lift Station Improvements - Proposal
Attachments: 1. Preliminary Design, 2. Signed - Contract
Title/Name/Summary
Consulting Engineering Services for 151st Street Lift Station Improvements - Proposal

History
In 2015, RJN Group Inc. of Wheaton, Illinois (RJN) was selected, by a competitive proposal process, to perform the Village’s Comprehensive Sanitary Sewer Evaluation Project over a five year period which was then renewed for an additional five years in 2020. A consultant was originally requested to guide the Village through the various technical processes to conform to new mandates issued by the Metropolitan Water Reclamation District (MWRD) Watershed Management Ordinance (WMO) as it relates to the reduction of inflow and infiltration (I&I) into the Village’s sanitary sewer system.

Staff in conjunction with RJN Group identified a high priority area to investigate for I&I. The area tributary to the 151st Street Lift Station was chosen. The 151st Street Lift Station, located at 9100 151st Street, was put into service in 1972. The station handles a large portion of the eastern side of the village including Catalina, Teebrook, Golfview, Silver Lake West and Maycliff subdivisions. In 2018, the main sewer line that feeds the station was cleaned and inspected as part of the MWRD mandated high priority area maintenance. With this lift station handling the largest volume of sewage, it is the most critical lift station within the community sanitary sewer system. The station has the capacity to pump 10,000 gallons per minute of sewage using three (3), 100 HP motors. Staff will typically see this volume during heavy rain events.

As part of their contract, RJN was tasked to “provide assistance in developing and implementing a Village-wide comprehensive sanitary sewer system evaluation & repair program,” for I&I. RJN has assisted in the establishment of some initial programs, parameters and bid documents for short term and long term operational activities. As a result of the I&I program, initially implemented in 2015, RJN is proposing to provide a repor...

Click here for full text