header-left
File #: 2021-0400    Version: 0 Name: 153rd Street and Ravinia Avenue Intersection Improvements, Phase 1 RFP 21-022, Contract Award
Type: MOTION Status: PASSED
File created: 5/20/2021 In control: Board of Trustees
On agenda: 6/7/2021 Final action: 6/7/2021
Title: /Name/Summary 153rd Street and Ravinia Avenue Intersection Improvements, Phase 1 RFP 21-022, Contract Award
Attachments: 1. RFP 21-022 Tabulation, 2. RFP 21-022 Audit Report, 3. RFP 21-022 DRAFT Agreement, 4. Signed Agreement, 5. Change Order #1 - Contract Signed, 6. Addendum #2 Contract Signed, 7. V3 Companies, LTD

Title/Name/Summary

153rd Street and Ravinia Avenue Intersection Improvements, Phase 1 RFP 21-022, Contract Award

 

History

In the Village of Orland Park, Ravinia Avenue functions as a bypass roadway to La Grange Road between 143rd Street and 159th Street. It serves several important functions including providing access to Village Hall complex, Police Department, businesses and residential developments along Ravinia Avenue, and reducing traffic pressure on La Grange Road. With the completion of Roundabout project at 147th Street in 2019 and 151st Street improvements which will be completed later this year, the only intersection that still requires improvements along Ravinia Avenue is at 153rd Street. In 2013, the intersection of 153rd Street and Ravinia Avenue was upgraded from a 4-way stop controlled intersection to a signalized intersection. Signal heads were mounted on wire spans and wood poles. Pedestrian facilities were not improved at that time. 

 

The scope of this Phase 1 study is to analyze current and future traffic conditions at the intersection, improve pedestrian facilities (crosswalks, sidewalks, and multi-use paths), and upgrade/improve traffic signal infrastructure. This project, when completed, will complete needed improvements along Ravinia Avenue between 143rd Street and 159th Street. Completion of Phase 1 study will further assist the Village in applying for funding for Phase 2 Design, Phase 3 Construction Engineering, and construction costs. The selected consultant will assist the Village (included in the scope of services) in submitting for these funding opportunities through IDOT, CMAP, and other sources.

 

A Request for Proposals for Phase 1 Design Engineering of the 153rd Street and Ravinia Avenue Intersection Improvements (RFP 21-022) was issued on April 13, 2021. Proposals were opened on May 4, 2021. The RFP was posted on BidNet. RFP information was downloaded by twenty-nine (29) firms. A total of two (2) proposals were submitted for the project by TranSystems Corporation and V3 Companies, Ltd. The lowest proposal amount was from V3 Companies, Ltd. with a total of $69,850.00. TranSystem Corporation proposed a fee of $92,648.00.

 

In addition to the lowest proposal amount, V3's proposal appropriately addressed items such as pedestrian infrastructure improvements, attention to utility coordination, its experience with intersections and traffic signal improvements, and other related items. V3 is a qualified and respected engineering consulting firm and staff recommends to accept its proposal.

 

Financial Impact

Funding for RFP 21-022, 153rd Street and Ravinia Avenue Intersection Improvements, Phase 1 is available in the Capital Improvement Plan for Engineering Programs and Services account 054-0000-471250.

 

Recommended Action/Motion

I move to approve awarding RFP 21-022 for Phase 1 Design Engineering Services for the 153rd Street and Ravinia Avenue Intersection Improvements to V3 Companies, Ltd. in an amount not to exceed $69,850.00.

 

And,

 

Authorize the Village Manager to execute all related contracts, subject to Village Attorney review.